Titel
The Leadership Fitness Doctrine: A Guide to Building a Foundation for Lifelong Leadership Excellence
Forfatter
Brian Phillips, Sydney Francis
- Oplæser
- Unknown [Male AI voice]
- Længde
- 1 t. 49 min.
- Sprog
- Engelsk
- Forlag
- Spines
Beskrivelse
Embark on a journey into the heart of true leadership with this transformative guide. Beyond administrative skill, it presents a holistic pathway to excellence, intertwining physical strength, mental clarity, emotional intelligence, and community. Discover how to align body and mind, fuel motivation, and nurture empathy. Within these pages, science meets philosophy, imparting tools for building inner sanctuaries and lasting empires, fostering a self-renewing leader whose influence echoes into eternity.
Links til lydbogstjenesterne er reklamelinks. Lydbogreolen får provision, hvis du opretter et abonnement via dem. Det koster ikke dig noget ekstra.
Lyt gratis
via Mofibo (14 dage gratis) Reklamelink
Ingen binding på abonnement. Gratis i 14 dage eller op til 20 timer for nye brugere.
Lyt til bogen gratis med disse tjenester
Lydbogstjenester:
Gratis prøveperiode
14 dage
Abonnement:
fra 89 kr./mdr.
Lydbogsbibliotek:
+ 1.000.000
Priser opdateret 27. november 2026
Prøv gratis
Reklamelink
14 dage gratis (op til 20 timer) for nye brugere, ingen binding.
Lignende bøger:
Simple Steps to Greater Confidence: Building an Unstoppable Mindset
Af Victoria David
Who Not How: The Formula to Achieve Bigger Goals Through Accelerating Teamwork
Af Dan Sullivan, Dr. Benjamin Hardy
Fostering Culture
Af Shane Jackson
The Culture Climb: How to Build a Work Culture that Maximizes Your Impact
Af Jaime Taets, Chelsey Paulson (Contributor)
Shopping Trip Math
Af Katie Marsico
Trade Works: The Smart Investor's Path to Uncorrelated Returns
Af Andreas Schweitzer